State
Maine
Route
Westbrook, ME → Conway, NH
Length
~47 mi
Bridges
8
Longest bridge
204 ft
The Maine Central's road to the White Mountains, waiting since 1983.
About 53 miles of the old Maine Central Mountain Division, from Westbrook, Maine, toward Conway, New Hampshire, along the Saco River valley. Guilford abandoned it in 1983, and the states now own it. WATCH: Maine plans to pull the rails between Standish and Fryeburg for a trail, with work expected around early 2027, so see it while it's still a railroad.
Through the mountains
The line was built in the 1870s as the Portland & Ogdensburg, meant to link Portland's harbor with the Great Lakes. Its most famous piece, in New Hampshire, climbed through Crawford Notch on ledges blasted from the cliffs and across the Frankenstein Trestle, one of the most spectacular railroad routes in New England. The Maine Central took it over and ran passenger trains and freight to Vermont for a century.
Waiting
Guilford Transportation abandoned the line in 1983, and the states of Maine and New Hampshire bought it to keep the corridor. In New Hampshire, the Conway Scenic Railroad runs excursion trains through Crawford Notch on part of the old line. On the Maine side, the rails are about to come out for a trail.
About 47 miles of track
Along the line
8 bridges
- 8 smaller bridges (under 300 ft)
- 8 bridges in all — longest 204 ft
Along the river
- Presumpscot River
- Little River
- Saco River
- Tucker Brook
- Burnt Meadow Brook
- Little Saco River
Getting there
Seeing it for yourself
Look at the tracks from the road first in Street View:
Keep exploring
Nearby lines
Photos & stories from riders
Loading…