State
South Carolina
Route
Campton, SC → Zirconia, NC
Length
~34 mi
Bridges
8
Longest bridge
745 ft
The steepest standard-gauge main-line grade in America.
About 34 miles of Norfolk Southern's W-Line from upstate South Carolina into North Carolina, including the legendary Saluda Grade. Norfolk Southern took it out of service in 2001, and the rails are still down.
Saluda Grade
The line was built in the 1870s to cross the Blue Ridge between Spartanburg and Asheville. Between Melrose and Saluda, North Carolina, the track climbs about 600 feet in three miles, with a grade close to 5%, the steepest standard-gauge main-line railroad grade in the United States. Runaway trains killed dozens of railroad men over the years, and the railroad built runaway tracks, uphill spurs where a train going too fast could be steered off the main line to stop.
The end and what's next
The Southern Railway, and then Norfolk Southern, ran trains up the grade for over a century, with helper engines pushing and extra brakes on every car coming down. Norfolk Southern stopped running the line in 2001. In 2023 conservation groups reached an agreement with Norfolk Southern to buy the corridor for the Saluda Grade Trail, so the rails may become a trail before long.
About 34 miles of track
Along the line
2 big bridges
- Unnamed bridge — 745 ft
- Unnamed bridge — 324 ft
6 more bridges
- 6 smaller bridges (under 300 ft)
- 8 bridges in all — longest 745 ft
Railroad relics
- Old depot
Along the river
- South Pacolet River
- North Pacolet River
- Green River
Getting there
Seeing it for yourself
Look at the tracks from the road first in Street View:
Keep exploring
Nearby lines
Photos & stories from riders
Loading…