← Huge TunnelsCalifornia

Jacumba – Anza-Borrego

Carrizo Gorge Tunnels

17 tunnels in 11 miles on the Impossible Railroad

Closed: tunnels unstableRails still in place. Closed since about 2008.

Tunnels

~17

In

~11 miles

Opened

1919

Closed

~2008

Engineers packed about 17 tunnels and a string of trestles into roughly 11 miles of granite gorge, finishing in 1919. Fires, rockslides and collapses closed them again and again. Tunnel 15's cave-in in 1932 is why the Goat Canyon Trestle exists.

The gorge has been closed to trains since about 2008. Several tunnels are partly collapsed or burned inside.

Getting there

  • Most visitors see the gorge on the hike to Goat Canyon Trestle. The tunnels are best seen from outside.

Where it is

32.7186, -116.1901

Photos

The railroad grade across the gorge wall
The railroad grade across the gorge wall · Jim Epler · CC BY-SA 2.5

Videos

Carrizo Gorge and The Impossible Railroad (1971 TV special)

CBS 8 San Diego

Mountain bike adventure, Impossible Railroad (2001)

New & Unique Videos

Be safe: railroad property is private unless it's an official trail or park. Never walk on active tracks, bridges or into tunnels that aren't open to the public.

More places nearby