Built
1932–33
Length
~600 ft
Height
~186 ft
Made of
Redwood
Owner
San Diego MTS
In 1932 part of Tunnel 15 caved in on the San Diego & Arizona's "Impossible Railroad" through Carrizo Gorge. Instead of re-boring it, engineers built a curved redwood trestle around the outside of the mountain, finished in 1933.
They chose wood because the canyon swings from freezing nights to scorching days, and wood handles that better than steel. It's the largest all-wood trestle in the world. Trains stopped around 2008, and the rails are still on it.
Getting there
- Most people hike in through Anza-Borrego Desert State Park on the Mortero Wash / Indian Hill route, roughly 8 to 14 miles round trip over rough ground.
- There's no water and almost no shade. Go between November and March.
- The trestle belongs to San Diego's transit agency and isn't maintained, so it's best enjoyed from the canyon floor.
Where it is
32.7291, -116.1836
Photos
Videos
Epic Drone Shot From Goat Canyon
The Rail Cart
Railcart ride up to the Goat Canyon Trestle
Ryan Randomness
Goat Canyon Trestle Hike Guide
HikingGuy.com
Test freight crossing Goat Canyon Trestle
2353Engineer · When trains still ran

.jpg?width=1280)



