← Back to map
MissouriCherryville → Boss

Lead Line — Cherryville to Boss

Good~22 mi of track

State

Missouri

Route

Cherryville → Boss

Length

~22 mi

Bridges

2

Longest bridge

320 ft

A railroad built for one of the world's richest lead districts.

About 25 miles of BNSF's Lead Line through Missouri's Viburnum Trend, from Cherryville south past Davisville, Viburnum and Bixby toward Boss. North of Cherryville it's still in service; this end is out of service.

Lead mining in southeast Missouri goes back to the 1700s. In the 1950s and 1960s companies found a new ore belt west of the Old Lead Belt, the Viburnum Trend, and it became one of the richest lead districts in the world. This line was built to haul ore and concentrate out of the new mines around Viburnum and Bixby. Some mines still operate, but this south end has gone quiet.

About 22 miles of track

Along the line

Big bridge

  • Unnamed bridge — 320 ft

1 more bridge

  • 1 smaller bridge (under 300 ft)
  • 2 bridges in all — longest 320 ft

Along the river

  • Huzzah Creek

Getting there

Seeing it for yourself

Look at the tracks from the road first in Street View:

Keep exploring

Nearby lines

Before you go: every railroad on this map is private property. A line that looks abandoned may still be owned by a railroad, used to store rail cars, or put back into service at any time — sometimes with no warning. Before going near any track, make sure it's truly abandoned (no recent use, rails not polished, no signals or cars stored on it) and that you're allowed to be there. Never assume a track is dead.

Photos & stories from riders

Loading…